Contractor worried event the work carried at RHS of track but if excavation is carried out maybe the water will surchage to work area.
water in the pond area will discharge first before work will be carried out at the RHS of the railway track
Location : Ch 38+500
Description : Site inspection for water ponding complaint by Contractor.



0 comments:
Post a Comment